A straight-talking guide for Queensland builders and owner-builders

If you’ve been referred to The Concept Group, chances are someone told you we’re fast, we’re local, and we build on ENDUROFRAME® steel. The next question we almost always hear is: “That sounds great — but what does it cost, and how long will it take?”

Fair question. Here’s an honest answer.

Why builders are asking this question right now

The past few years haven’t been kind to timber supply chains. Price spikes, delivery delays, and quality inconsistency have pushed a lot of Queensland builders and owner-builders to seriously reconsider their framing material. At the same time, insurance premiums in bushfire-prone and cyclonic regions have risen sharply — and that’s where steel starts to make a lot of financial sense beyond just the frame price itself.

ENDUROFRAME® light gauge steel framing, manufactured from BlueScope TRUECORE® steel, is now a mainstream choice across residential and light commercial builds in Queensland — and The Concept Group manufactures it right here in Toowoomba.

What drives the cost of steel framing?

Steel framing isn’t a flat rate per square metre. The price you pay depends on several factors specific to your project:

Realistic price ranges (2025)

We’ll be upfront: publishing a single number for steel framing is misleading, and any supplier who quotes you a precise figure without seeing your plans is guessing. That said, here are realistic ballpark ranges for our supply-only framing packages in Queensland:

Note: These figures are for materials and engineering only — installation, footings, cladding, and fit-out are separate. For a full modular home package where we handle manufacturing and delivery, the numbers look different again.

The single biggest driver of cost variance is wind classification. A C2-rated frame in regional Queensland can be 25–40% heavier in material than an equivalent N3 suburban frame — that’s real money, and it’s why we always want to see your site address before quoting.

What’s included in a Concept Group steel frame quote?

When we quote a frame supply package, here’s what’s covered:

What’s not included in a supply-only quote: Installation labour, connection hardware beyond standard frame fixings, footings, concrete, or any trades work on site.

How long does it take?

This is where ENDUROFRAME® steel framing from a local Queensland manufacturer genuinely outperforms most alternatives.

From quote to frame delivery, here’s a realistic timeline:

Stage Typical Duration
Plans received and quote issued 3–5 business days
Quote acceptance and engineering sign-off 1–2 weeks (dependent on client)
Frame manufacture in our Toowoomba factory 1–3 weeks (depending on scope)
Delivery to site 1–5 days (depending on location)
Total from go-ahead to frame on site 3–6 weeks

For comparison, some steel frame suppliers in SEQ are currently quoting 10–14 week lead times. Our in-house manufacturing means we control the schedule — we’re not waiting on a third-party fabricator.

For full modular home packages, our standard delivery timeframe is 6–8 weeks from build approval to delivery on site.

What can slow things down?

Being honest here matters. A few things can extend that timeline:

The best thing you can do to get frames on site fast is to engage us early — ideally while your building application is being prepared, not after it’s approved.

Steel vs. timber: why the value case is strong

Comparing steel and timber on frame price alone misses the point. The real question is what the choice costs you across the full build — and over the life of the structure.

Here’s where ENDUROFRAME® steel consistently wins:

When you factor in termite proofing, reduced callbacks, faster site handling, and long-term durability, the case for steel framing in Queensland is compelling — and the numbers tend to stack up across the full project.

How to get a fast, accurate quote

The fastest path to a number is to send us:

  1. Your architectural plans (DA-approved or in-progress — we can work with either)
  2. Your site address (so we can confirm wind classification and BAL)
  3. Your preferred frame scope (wall frames only, full package, or modular home)
  4. Your target start date on site

We’ll come back to you within 3–5 business days with a detailed frame package quote, not a ballpark.


Get in touch with The Concept Group in Toowoomba 📍 Toowoomba, QLD
✅ QBCC Licensed | Master Builders Member
🌐 theconceptgroup.com.au

The Concept Group manufactures ENDUROFRAME® steel frames and modular homes from our Toowoomba factory. We supply residential and light commercial builders across Queensland and regional New South Wales. All frames are engineered to NCC, AS/NZS 4600, and site-specific wind and BAL classifications.